Initial Operation; Startup / Warm Up Of The T102; Functional Check Of The T102 - Teledyne T102 Operation Manual

Total reduced sulfur analyzer with thermal converter
Table of Contents

Advertisement

Pneumatic Connections

4.2. Initial Operation

4.2.1. Startup / Warm Up of the T102

Possible Warning Messages at Start-Up

4.2.2. Functional Check of the T102

Test Functions
SAMPLE
< TST TST >
Toggle <TST TST> to scroll
through list of functions
1
Only appears if IZS option is
installed.
2
Only appears if analog output A4
is actively reporting a test function.
3
Shown as they appear when analyzer
is in TRS mode. In SO
SO2 SLOPE. In multigas mode, both versions appear.
30
Teledyne API - T102/501 TRS, Addendum to T101 Operation Manual
Startup procedures and warm up behavior of the T102 are identical to those described in
the T101 Manual - PN 07266.
Warning messages for the T102 is the same as the list of warning messages included in
Appendix A: Mode 101E Warnings and Test Measurements in the T101 Manual - PN
07266 with the exception that there is no CONV TEMP WARNING (converter
Temperature Warning).
To performing an initial functional check of the T102, follow the steps contained in the
Functional Check section in the T101 Manual - PN 07266.
The following diagram supersedes the diagram found in Step 2 of the Functional Check
section in the T101 Manual - PN 07266.
RANGE = 500.0 PPB
CAL
mode appear as SO2 STB, SO2 OFFS &
2
TRS = X.X
SETUP
RANGE
3
TRS STB
PRES
SAMP FL
PMT
NORM PMT
UV LAMP
LAMP RATIO
STR. LGT
Refer to the T101
DARK PMT
Manual for
DARK LAMP
3
definitions of these
TRS SLOPE
test functions.
3
TRS OFFS
HVPS
RCELL TEMP
BOX TEMP
PMT TEMP
1
IZS TEMP
2
TEST
TIME
07267B DCN6485

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

501 trs

Table of Contents