Power On Test; Turning On The Equipment; Observing Software Boot Up - Philips M3150B Installation And Service Manual

Information center system
Table of Contents

Advertisement

Configuring the System
Power On
The following steps describe the turn-on sequence for the Information Center system and
Test
observations that are to be made during software start up.
Turning on the
Turn on the components in the following sequence. On/Off switches for typical units are
Equipment
shown in Figure 8-1.
On/Off Switch
(behind flip-up door)
Step 1. Turn on the UPSs
Step 2. Turn on the Display(s)
Step 3. Verify that each unit turns on correctly and its On light is illuminated.
Step 4. Verify that all active Network devices (switches, repeaters, media translators) are
Observing
The software boot up process has 2 phases -- the OS boot process and the Philips boot
Software Boot
process. The steps of these processes are described below. Follow the start up sequence and
Up
verify the following:
OS Boot Process (approximately 120 seconds)
Step 1. Turn on the PC or Server.
8-2
Start-up and Configuration
On/Off
Switch
UPS
A
B
C
5
4
3
2
1
0
5
4
3
2
1
0
Database Server
Figure 8-1 On/Off Switch Locations for Components
on and their On LED is illuminated.
On/Off
Button
CRT Display
On/Off
Button
Printer
On/Off
Button
Flat Panel Display
On/Off Button
Workstation

Advertisement

Table of Contents
loading

This manual is also suitable for:

M3170M3155bM3151bIntellivue seriesM3169aM3154b

Table of Contents