Auxiliary Cooler Service; Auxiliary Cooler Removal; Auxiliary Cooler Installation; Auxiliary Cooler Mounting - Jeep J-10 Series 1982 Technical & Service Manual

Table of Contents

Advertisement

2C-4 AUTOMATIC TRANSMISSION
FROM FRONT (KICKDOWN) SERVO
APPLY SIDE
FROM REAR CLUTCH CIRCUIT
FROM 2-3 SHIFT VALVE
FROM GOVERNOR VALVE
FROM THROTTLE VALVE
FROM PRESSURE
REGULATOR VALVE
ACCUMULATOR
LOCK-UP ONLY
LOCK-UP MODULE
FRONT
CLUTCH
LUBRICATION
OIL PRESSURES
LINE
THROTTLE
GOVERNOR
CONVERTER
LUBRICATION
57-94 PSI
0-94 PSI
6-94 PSI
5-94 PSI
5-70 PSI
INDICATES VALVE
MOVEMENT
EE3
S3
TORQUE CONVERTER
Fig. 2C-4 Lockup Torque Converter Control System
90222
.Fig. 2C-5 Auxiliary Cooler Mounting
Auxiliary Cooler Service
If it becomes necessary to overhaul the transmission
to correct a malfunction that generated sludge or heavy
accumulations of metal particles or friction material,
the auxiliary cooler and cooler hoses must also be
flushed thoroughly along with the radiator cooler.
The radiator cooler flushing procedure is outlined in
this chapter. Refer to Flushing Oil Cooler and Cooler
Lines.
If the auxiliary cooler must be removed and installed
for servicing or for access to another component, refer to
the following procedure.
Auxiliary Cooler Removal
(1) Remove screws and washers attaching grille
panel to grille face panel assembly.
(2) Remove grille panel.
(3) Tag cooler hoses for assembly reference.
(4) Position drain pan under coo.-.t.
(5) Loosen clamps attaching cooler hoses to cooler
fittings (fig. 2C-6).
(6) Slide cooler hoses off cooler fittings. Cover hose
ends to prevent entry of dirt.
(7) Remove screws attaching cooler to grille face
panel and remove cooler.
Auxiliary Cooler Installation
(1) Position cooler on grille face panel and install
cooler attaching screws.
(2) Remove protective covering from ends of cooler
hoses and install hoses on cooler fittings.
(3) Tighten cooler hose clamps securely.

Advertisement

Table of Contents
loading

Table of Contents