Jeep J-10 Series 1982 Technical & Service Manual page 350

Table of Contents

Advertisement

1J-38
FUEL SYSTEMS
MAIN METERING JET
REMOVAL TOOL
V
Fig. 1J-75 Carburetor Model E2SE—
Extended Main Metering Jet Removal
CAUTION: Do not attempt to remove plastic retainer
by prying out with a tool such as a punch or screwdriver.
This will damage the sealing beads on the bowl casting
surface and necessitate complete float bowl
replacement.
(21) Using needlenose pliers, or equivalent, remove
plastic retainer holding pump discharge spring and
check ball in place (fig. 1J-76). Discard plastic retainer
(replacement retainer is required for reassembly).
(22) Turn bowl upside down and catch pump dis
charge spring and check ball in palm of hand.
PUMP DISCHARGE SPRING
AND BALL RETAINER
90667
Fig. 1J-76 Carburetor Model E2SE-
Pump Discharge Retainer Removal
NOTE: The tamper-resistant choke cover design is
used to discourage indiscriminate readjustment of the
choke cover and coil assembly in thefield. However, it is
necessary to remove the cover and coil assembly during
normal carburetor disassembly for cleaning and
overhaul.
(23) With small chisel and hammer, carefully cut off
each rivet head (fig. 1J-77). Use a drift and small ham
mer to drive remainder of rivets out of choke housing.
Use care to prevent damage to choke cover and housing.
81089A
Fig. 1J-77 Carburetor Model E2SE—Choke Cover Rivets Removal
(24) Remove three retainers and choke cover assem
bly from choke housing.
(25) Remove screw from end of intermediate choke
shaft inside choke housing (fig. 1J-78). Remove choke
coil lever from shaft.
CHOKE COIL LEVER
LEVER
ATTACHING
SCREW
90668
Fig. 1J-78 Carburetor Model E2SE—Choke Coll Lever Removal
(26) Remove intermediate choke shaft and lever as
sembly from float bowl by sliding rearward out throttle
lever side (fig. 1J-79).
(27) Remove choke housing by removing two attach
ing screws in throttle body (fig. 1J-80).

Advertisement

Table of Contents
loading

Table of Contents