Suzuki XL7 2007 Service Manual page 2588

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

9E-40 Glass / Windows / Mirrors:
Watertest Stand Assembly
1. Pipe (0.5 x 36 in)
2. Reducing Tee, Right Stand Only (0.5 x 0.5 x 0.25 in)
3. Coupling, Left Stand Only, (0.5 in)
4. Tee, Left Stand Only (0.5 in)
5. Cross, Right Stand Only (0.5 in)
6. Pipe to Hose Nipple, Right Stand Only (0.5 in)
7. Female Hose Coupling (5/8 in)
8. Input Hose, Right Stand Only (2.0 ft) (5/8 in diameter)
9. Close Nipple (0.5 in)
10. Cross (0.5 in) with Weld-On Cap (0.5 in)
11. Nipple (0.5 x 12 in)
12. Cap (0.5 in)
13. Female Hose Coupling (5/8 in)
14. Cross Hose (12 ft) (5/8 in diameter)
15. Hose Quick Connect
16. Pipe to Hose Nipple (0.5 in)
17. Pipe (0.5 x 60 in)
18. Water Pressure Gage, Right Stand Only
19. Full Jet Spray Nozzle, No. 1/2GG-25 or Equivalent
20. Coupling (0.5 in)
1. Assemble the water test stand as shown.
2. Position the stands as shown.
The water spray from the stands should overlap the
vehicle as shown.
3. Have an assistant inside of the vehicle during the
test in order to locate any leaks.
4. The water pressure at the nozzle should maintain a
155 kPa (22 psi), for at least 4 minutes.
5. In order to check the windshield, aim the water spray
30 degrees down and 45 degrees toward the rear.
Aim the water towards the corner of the windshield.
6. In order to check the side windows for leaks, position
the water stand towards the center of the rear
quarter, aiming the water spray 30 degrees down
and 45 degrees toward the rear.
7. In order to check the back window, aim the water
spray 30 degrees down and 30 degrees toward the
front.

Advertisement

Table of Contents
loading

Table of Contents