Omron SCARA R6Y-XC Series User Manual page 162

Table of Contents

Advertisement

CHAPTER 5 Periodic Inspection
8) Remove the wave generator from the motor shaft. The wave generator is
secured with an M4 set screws. (See Fig. 5-27.)
WARNING
WHEN YOU REMOVE THE Y-AXIS ARM INSTALLATION BOLTS (M3×20L,
12 PIECES) IN THE NEXT STEP, THE Y-AXIS ARM MAY COME OFF
CAUSING A HAZARDOUS SITUATION. BE ESPECIALLY CAREFUL TO
KEEP THE ARM FROM FALLING WHEN A HEAVY TOOL IS ATTACHED
TO THE ARM TIP.
9) Remove the Y-axis arm installation bolts (M3×20L, 12 pieces). (See
Fig. 5-24.)
10) Remove the Y-axis arm and place it where it will not obstruct the work.
CAUTION
AN O-RING IS FITTED TO THE UPPER SURFACE OF THE HARMONIC
DRIVE, SO BE CAREFUL NOT TO LET IT DROP INTO THE PERIPHERAL
UNIT.
11) Remove the Y-axis harmonic drive installation bolts (M3×40L, 8 pieces)
from the bottom of the arm. (See Fig. 5-25.)
12) Remove the Y-axis harmonic drive from the top of the X-axis arm.
M3×20
Fig. 5-24
M3×40
Fig. 5-25
5-34

Advertisement

Table of Contents
loading

Table of Contents