Oil Cooler Tank Pipe Assembly-Renew; Oil Thermostat To Tank Tube Assembly-Renew; Oil Pump Inlet Tube Assembly-Renew - Aston Martin V8 Vantage Workshop Manual

Table of Contents

Advertisement

4. Disconnect top hose from engine (clip x1) tie aside
(catch coolant).
5. Remove breather pipe (quick fit).
6. Remove pipes (x2) from oil tank, tie aside.
7. Raise vehicle on ramp.
8. Remove undertray (see Workshop Manual procedure
01.02.NB Undertray - Front - Renew).
9. Drain oil tank.
10. Remove bottom pipe (x1) from oil tank.
11. Remove bolts (x3) securing oil thermostat to body
(allows oil hose movement).
12. Lower ramp.
13. Remove bolts (x4) securing tank to body and lift out.
Installation
1. Position tank to body and fit bolts (x4) (torque).
2. Install oil pipes to tank (torque).
3. Connect breather hose.
4. Connect top hose to engine (clip x1).
5. Raise vehicle on ramp.
6. Install bottom oil pipe to tank (torque).
7. Install bolts (x3) securing oil thermostat to body (torque).
8. Install undertray (see Workshop Manual procedure
01.02.NB Undertray - Front - Renew).
9. Lower vehicle.
10. Install throttle body duct.
11. Connect breather pipe quickfits (x2) to air cleaner duct.
12. Fill tank with approximately amount of displaced oil and
replace cap.
13. Use handbook procedure to check oil level.
14. Top up coolant.

Oil Cooler Tank Pipe Assembly-Renew

Repair Operation Time (ROT)
Item
Oil Cooler Tank Pipe Assembly-Renew
Removal
1. Remove oil pipe from oil tank.
2. Raise vehicle on ramp.
3. Remove undertray (see Workshop Manual procedure
01.02.NB Undertray - Front - Renew).
4. Remove RH air filter box (see Workshop Manual
procedure 03.12.BB Air Filter Box RH Renew).
5. Unclip pipe (x4) from inner wing.
6. Remove pipe from oil cooler and pull out from inner
wing (position container to catch oil).
Installation
1. Install pipe to oil cooler (torque) through inner wing.
2. Clip pipe (x4) to inner wing.
3. Install undertray (see Workshop Manual procedure
01.02.NB Undertray - Front - Renew).
October 2005
4. Install RH air filter box (see Workshop Manual
procedure 03.12.BB Air Filter Box RH Renew).
5. Lower vehicle on ramp.
6. Install pipe to oil tank (torque) ensure correct alignment
in oil tank bracket.
7. Fill tank with approximately amount of displaced oil and
replace cap.
8. Use handbook procedure to check oil level.
Oil Thermostat to Tank Tube Assembly-
Renew
Repair Operation Time (ROT)
Item
Oil Thermostat to Tank Tube Assembly-
Renew
Removal
1. Disconnect breather pipe quickfits (x2) from air cleaner
duct.
2. Remove throttle body duct for access (clips x3).
3. Remove pipes from oil tank.
4. Raise vehicle on ramp.
5. Remove undertray (see Workshop Manual procedure.
01.02.NB Undertray - Front - Renew).
6. Remove pipe from oil thermostat (position container to
catch oil).
Installation
1. Install pipe to oil thermostat (torque) ensure correct
alignment in oil tank bracket.
2. Install undertray (see Workshop Manual procedure
01.02.NB Undertray - Front - Renew).
3. Lower vehicle on ramp.
4. Install oil pipe to tank.
5. Install throttle body duct.
6. Connect breather pipe quickfits (x2) to air cleaner duct.
Code
7. Fill tank with approximately amount of displaced oil and
03.02.CC
replace cap.
8. Use handbook procedure to check oil level.

Oil Pump Inlet Tube Assembly-Renew

Repair Operation Time (ROT)
Item
Oil Pump Inlet Tube Assembly-Renew
Removal
1. Remove P .A.S pump (see Workshop Manual procedure
03.05.AA XREF: 404 Pump - Power Steering - Renew
2. Remove pipe from oil controller (position container to
catch oil).
3. Remove bolt, pipes to bracket.
4. Remove LH exhaust manifold. (see Workshop Manual
procedure 09.00.CD Gasket - Exhaust Manifold - LH -
Renew).
5. Remove harness to pipe clip.
Workshop Manual
Cooling System (03.03)
Engine (03.00)
Code
03.02.CD
Code
03.02.CE
3-4-5

Advertisement

Table of Contents
loading

Table of Contents