GOT-F900 units are designed as to be embedded in a panel. Install the GOT using the procedure
shown below. For the panel cut dimension, refer to the previous page.
1) Inserting the GOT into the panel face
Attach a packing seal to the GOT. Insert the GOT from the
front of the panel face.
a) GOT
b) Packing seal
c) Installation hole
2) Fixing the GOT
Hang the hook of the metal fixture (offered as accessory) to
installation hook holes in the GOT. Tighten the bolt (offered as
accessory) securely in each position.
The GOT can be fixed in just four positions, at each corner.
However, to prevent dusts and water, fix the GOT in all six posi-
tions (excluding the F930GOT).
a) Metal fixture
b) Tightening bolt
* Make sure that the tightening torque for each bolt is 0.3 to 0.5
N•m.