NEC Univerge sv8500 Manual page 2352

Fp85-110 s7
Hide thumbs Also See for Univerge sv8500:
Table of Contents

Advertisement

• The SR-MGC(E) connects to a network with transmitting speed of 10Mbps.
• If you expected transmitting speed of 1Gbps or 100Mbps, check a connected network device
and a cable between them.
STEP 4: Is the Online lamp turned ON?
- No.
• Indicates that the SR-MGC(E) is not set up.
Reread
Startup
- Yes.
Move on to the next step.
STEP 5: Can you make a call from a station that is controlled by the SR-MGC(E)?
The following is an example of a call test for an SR-MGC(E).
Set an intended SR-MGC(E) on a test
environment to test IP terminal operation.
Then install the SR-MGC(E) onto an actual
environment.
[1]
Prepare a test environment which provides a connection to an MGC.
[2]
Disconnect the test environment from the MGC; the SR-MGC should start its operation.
[3]
Call with an IP terminal for test to another to check connectivity.
Perform the call test in an environment where no other network device is involved.
Note:
- If there is a problem with an outgoing/incoming call;
to make sure that all steps in the procedure are performed.
Test Environment
VOL.2-2099
HO
PWR ACT
IP Terminals for Test
SR-MGC(E)
BO

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents