Siemens sinamics dcp Operating Instructions Manual page 76

Dc/dc power converter
Hide thumbs Also See for sinamics dcp:
Table of Contents

Advertisement

Commissioning
7.2 Commissioning using the BOP20 operator panel
See function diagram 2460 in the SINAMICS DCP List Manual.
p852 signal source for enabling operation
Recommended setting: p852 = 1
See function diagram 2460 in the SINAMICS DCP List Manual.
〈4〉Setting the type of precharging
p55350, type of precharging
1
2
3
4
p55352 signal source for precharging the target value
This signal source must be switched at p55350 = 1 or 2.
Recommended setting: p55352 = r2090[2] (3rd receive word from the fieldbus)
See function diagram 6835 in the SINAMICS DCP List Manual.
p55355[0] and [1] maximum duration of precharging on side 1 or side 2
Factory setting: 100 ms
p55356[0] and [1] maximum switching time of the DC contactor on side 1 or side 2
Factory setting: 100 ms
〈5〉Input of the data for the undervoltage/overvoltage protection
● Protection of the input (= side 1) against undervoltage
– p55130, lower threshold of the undervoltage protection
– p55131, upper threshold of the undervoltage protection
● Protection of the input (= side 1) against overvoltage
– p55132, lower threshold of the overvoltage protection
– p55133, upper threshold of the overvoltage protection
● Protection of the output (= side 2) against undervoltage
– p55140, lower threshold of the undervoltage protection
– p55141, upper threshold of the undervoltage protection
● Protection of the output (= side 2) against overvoltage
– p55142, lower threshold of the overvoltage protection
– p55143, upper threshold of the overvoltage protection
76
Resistance precharging on side 1, step-up on side 2
Resistance precharging on side 2, step-up on side 1
Resistance precharging on both sides (first side 1, then side 2)
Resistance precharging on both sides (first side 2, then side 1)
Operating Instructions, 05/2016, A5E34382853K
SINAMICS DCP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents