Siemens sinamics dcp Operating Instructions Manual page 74

Dc/dc power converter
Hide thumbs Also See for sinamics dcp:
Table of Contents

Advertisement

Commissioning
7.1 Switching on
34
35
70
80
99
The states listed above are automatically run through during the commissioning and are
normally not visible.
In the following exceptional cases, ramp-up is interrupted with display value 33. In this state,
the device can be parameterized via BOP20 and via STARTER:
● Differences have been identified between the reference and actual topology.
– Correct the topology (e.g. re-insert the TM component).
– Accept the actual topology into the reference topology by setting p9905=1 or p9905=2.
● A memory card with a parameter data set which comes from a SINAMICS DCP with a
different MLFB, is inserted in the device.
– Accept the parameter data set by setting p9906=3. Ramp-up is continued.
74
Terminating commissioning mode
Performing first commissioning
Initialization
Reset active
Internal software error
Ramp-up is continued.
Operating Instructions, 05/2016, A5E34382853K
SINAMICS DCP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents