Siemens sinamics dcp Operating Instructions Manual page 199

Dc/dc power converter
Hide thumbs Also See for sinamics dcp:
Table of Contents

Advertisement

Image 8-47
Once the "Edit EtherNet Node" dialog box has closed and the node overview has been
updated (F5), a display indicates that the node properties have been successfully assigned.
Image 8-48
STARTER - Accessible nodes update completed
Note
The IP addresses allocated for the PC and the PROFINET interface in the drive must be
different; otherwise communication between the PC and drive is not possible.
SINAMICS DCP
Operating Instructions, 05/2016, A5E34382853K
STARTER - Successful assignment of the IP configuration
8.6 Communication via PROFINET IO
Operation
199

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents