6.5
VERTICAL TRANSPORT UNIT REMOVAL
[B]
[A]
1. Remove the sorter stapler from the copier.
2. Remove the proof tray, the front cover, the rear cover, and the upper cover.
3. Remove the upper hinge [A] (2 screws) and the sorter stapler set switch
bracket [B] (1 screw).
4. Remove the grounding screw [C] and disconnect the main harness [D] (5
connectors and 3 harness clamps).
5. Remove the timing belt [E] from the pulley [F].
6. Remove the vertical transport unit [G] (8 screws).
FSM
[G]
10-25
[C]
[D]
[F]
[E]
FT5535/4527/4522