Start-Up Diagnostics - Epson Stylus Pro 5000 Service Manual

Color ink jet printer
Hide thumbs Also See for Stylus Pro 5000:
Table of Contents

Advertisement

5
Checking the RIP Station 5000 as a stand-alone unit
Board diagnostics
Board diagnostics include the set of tests run at startup, as well as a more detailed set of
DIMM tests. Board tests run for 10 minutes and focus on testing components on the
RIP Station 5000 motherboard. For the complete list of Board tests, see Table 5-3.
T
B
O RUN
OARD DIAGNOSTICS
1. At the Diagnostic Sets screen, press the line selection button next to Board. See
"RIP Station 5000 diagnostic sets" on page 5-11 to access the Diagnostic Sets screen.
The tests begin running immediately. Board tests run for approximately 10 minutes.
2. If any of the tests fail, check the Details option in the diagnostic report menu for more
information about the failing test (see "Viewing the diagnostic report" on page 5-18).
Then shut off the RIP Station 5000, and perform the recommended service for the failed
test or replace the failed component.
3. If the Board diagnostics all pass, the Control Panel indicates that all tests passed. Press
the menu button to restart the RIP Station 5000.

Start-up diagnostics

Start-up diagnostics include the set of RIP Station 5000 tests listed in Table 5-1. These
tests are the same tests that are run when you turn on the RIP Station 5000 or reboot the
system. The Start-up tests focus on testing components on the RIP Station 5000
motherboard.
T
S
-
O RUN
TART
UP DIAGNOSTICS
1. At the Diagnostic Sets screen use the down button to scroll through the menu. Press the
line selection button next to Start-up. See "RIP Station 5000 diagnostic sets" on
page 5-11 for information on how to access the Diagnostic Sets screen
The tests begin running immediately.
2. If any of the tests fail, check the Details option in the diagnostic report menu for more
information about the failing test (see "Viewing the diagnostic report" on page 5-18).
Then shut off the RIP Station 5000, and perform the recommended service for the failed
test or replace the failed component.
3. If the Start-up diagnostics all pass the RIP Station 5000 will automatically continue
with the standard startup process.
See "Errors during the Start-up diagnostics" on page 5-7 for a list of tests.
.
5-17

Advertisement

Chapters

Table of Contents
loading

Table of Contents