Epson Stylus Pro 5000 Service Manual page 118

Color ink jet printer
Hide thumbs Also See for Stylus Pro 5000:
Table of Contents

Advertisement

Stylus Pro5000
9
CHECK POINT
When installing "ASF Gear Train Cover
Assembly", install it so that the angle of "Lever
Assembly, Planetary, ASF" is up at the left side.
(Refer to Figure4-78)
10. Remove "Gear,11.4". (Refer to Figure4-79)
11. Remove "Gear,31.8". (Refer to Figure4-79)
12. Remove "Gear, 35.4". (Refer to Figure4-79)
13. Release tension of "Torsion Spring, 1.27", and remove it.
(Refer to Figure4-79)
14. Remove "Lever Belt Tension" with "Roller Belt Tension" and "Roller Belt".
(Refer to Figure4-79)
9
CHECK POINT
"Lever, Belt Tension", "Roller Belt Tension" and
"Roller Belt" are installed, as it is shown in
Figure4-80. (Refer to Figure4-80)
Rev. A
"Lever Assembly, Planetary, ASF"
Not Good Condition
Figure 4-78. Condition of "Lever Assembly, Planetary, ASF" before
installing "ASF Gear Train Cover Assembly"
"Gear,35.4"
"Gear,31.8"
"Gear,11.4" "Lever Belt Tension"
Figure 4-79. ASF Control Parts Removal
Chapter4
Push Up.
Correct Condition
"Torsion Spring, 1.27"
4-42

Advertisement

Chapters

Table of Contents
loading

Table of Contents