Epson Stylus Pro 5000 Service Manual page 120

Color ink jet printer
Hide thumbs Also See for Stylus Pro 5000:
Table of Contents

Advertisement

Stylus Pro5000
19. Release "Torsion Spring,3.92" which is giving tension to "Lever, Stopper,
ASF", and remove "Lever, Stopper, ASF". (Refer to Figure4-82)
20. Remove "Combination Gear,30.30", and remove "Lever Assembly,
Hopper".
21. Remove "Combination Gear,13.8,17.4". (Refer to Figure4-82)
22. Remove "Gear,12.8". (Refer to Figure4-82)
9
CHECK POINT
In case of removing "Gear,12.8", since there is
phase(engagement) between the gear located on
the "Hopper Release Assembly" and "Gear,12.8",
refer to Figure4-83 and arrange phase between
these two gears. When moving "Hopper
Assembly" right and left manually, insert
"Gear,12.8" into the axis so that the big gear of
"Gear,12.8" can engage with the big gear on the
"Hopper Release Assembly".
Rev. A
"Torsion Spring,3.92"
"Lever, Stopper, ASF"
"Combination Gear,30.30"
Figure 4-82. "Lever, Stopper, ASF" ,"Combination Gear 13.8.17","Lever,
Stopper, ASF", "Gear,12.8", "Combination Gear,13.8, 17.4", "Lever
Assembly Hopper" Removal
"Gear,12.8"
Figure 4-83. Matching phase for "Gear, 12.8"
"Combiantion Gear,13.8,17.4"
"Lever Assembly, Hopper"
"Gear, 12.8"
"Frame Gear" on
the "Hopper Release
Lever Assembly"
Chapter4
4-44

Advertisement

Chapters

Table of Contents
loading

Table of Contents