Toshiba Strata DK 280 Installation Manual page 635

Digital business telephone system
Hide thumbs Also See for Strata DK 280:
Table of Contents

Advertisement

cables
that comply
with Ti span specifications
for
connecting
the CSU to customer
premise
equipment
(like DK280,
RDTU)
and to the Network
Interface
equipment.
11.6
RDTU Loop Back Testing
The
RDTU
provides
three
loop
back
te.st
configurations.
These
loop back tests
should
be
performed
as required
in conjunction
with CSU loop
back tests (see CSU loop back test documentation).
11.6.1
RDTU
Self Test
This test should be performed
upon initial installation
of a RDTU PCB. Program the RDTU per Section 11.4
of this section; then perform the RDTU loop back test,
per the instructions
in Figure 11-7, before connecting
the far end (CSU, Network, or CPE) Tl span line.
11.6.2
Network/CSU
Tl Span Test
This test will verify that the far end (CSU, Network, or
CPE) Tl equipment
and span cabling
is functioning
properly. This test checks all Tl span cabling including
the RDTU amphenol
cable and connector.
Guidelines
for this test are provided in Figure 11-8.
11.6.3
Network/CSU/RDTU
Span Test
This test checks all equipment
that is checked with the
test in the above paragraph,
but this test also checks
RDTU SELF CHECK
1
MM8976B
that the RDTU Mite1 LSI chip is functioning.
Guidelines
for this test are described
in Figure 11-9.
Note:
Loop
back
tests
shown
in Figures
11-7,
11-8, and I l-9 show loop back testing
with
CSlJ and Network equipment.
The same tests
can be performed
when connecting
the RDTU
PC9 directly
to a customer
premise
(PBX,
Key Hybrid, Channel bank) Tl circuit.
RDTU Self Check
n
Active test of RDTU circuit.
Network/CSU
Test
W Tests all cables,
Network
and CSU equipment
(RDTU is not active).
Remote
Loop Back (RLB) Test
W Active
test
of RDTU
(LSI
MM8976B),
CSU,
Network equipment
and all cables.
CSU Local/Network
Loopback
Tests
n
See Figure
11-10 and the CSU manufacturer's
Installation and Maintenance
manual.
REMOVE NDTU CABLE
a
+T
\
_
P2
MI-TEL CHIP
1
DK0516
General Notes:
l
Pl and P2 to ON position (see Figure 1 l-5).
l
Remove NDTU cable from RDTU amphenol
connector.
l
After about 12 seconds, all RDTU LEDs (except PRI/SEC SYNC) turn off.
l
Appropriate
primary or secondary
sync. LED flashes if RDTU is Primary or Secondary
reference.
l
If RDTU is not a primary or secondary
reference,
then the Primary and Secondary
sync LEDs
should turn off.
Figure
11-7
RDTU
Self Test
January
1996
11-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents