Tl Interface
11.1
RDTU (Tl) Installation
Guideline
Toshiba
recommends
the following
when
installing
Strata DK280 RDTU (Tl) circuit boards.
1.
2.
3.
4.
5.
6.
7.
Read Section 11.2 before proceeding
to Step 2.
Run
RDTU
Tl
related
system
programs
as
described
in Section 11.3 of this chapter.
Set Pl and P2, loop
back jumper
to the ON
position for RDTU self test (see Figure 11-5).
Refer to Subsection
11.5.1
for the appropriate
SW1 Equalizer Switch setting and set SW1 to the
setting that matches the RDTU cable length.
Note:
Ensure the RDTU's component
side is facing
right when installing it in the Key Service Unit
(KSU).
Insert
the RDTU
into the appropriate
slot and
apply firm, even pressure to ensure proper mating
of connectors.
See Tables 11-1, 11-2 and 11-3 for
RDTU
slot installation
roles.
If the
RDTU
is
providing
tie or DID lines, special consideration
must be taken to determine
which slot to install the
RDTU, see Worksheet
2 of Chapter
1 for tie/DID
slot assignment
recommendations.
After installing
the RDTU,
gently
pull the PCB
outward.
If the connectors
are properly
mated, a
slight resistance will be felt.
Run the RDTU self check per Subsection
11.6.6.
After self check passes, put PI and P2 to the OFF
position for normal operation
and insert the RDTU
PCB back into the appropriate
slot.
8.
9.
Install Channel
Service Unit(s) (CSUs)
and wire
CSUs to the RDTU and Network Interface
Unit or
Customer
Premises
Tl, circuit as required
per
Section 11.4.
Note:
Before connecting
the CSU to the Telco line,
notify the TI provider.
You should a/so notify
the TI provider before disconnecting
the CSlJ.
Perform CSU to RDTU and CSU to Network
loop
back testing per CSU documentation
and Section
11.6 of this section (see Figure 11-l 0).
10. After
loop
back
testing
is complete
and
is
synchronized
with the far end Ti circuit, perform
test
calls
on
all
RDTU
lines.
(Use
the
troubleshooting
procedures
in Section 11.8 of this
section to help correct problems.)
11. Check
Tl
performance
periodically
for
transmission
errors
using
the "Tl ERR" test
described
in the Section
13.9, Data Dump Mode.
This requires
a local
or remote
maintenance
terminal
connected
to the PIOU or PIOUS PCB
(local) and IMDU or Hayes-compatible
modem
(remote).
January
1996
11-l

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents