Mitsubishi Electric M800W Series Connection And Set Up Manual page 469

Hide thumbs Also See for M800W Series:
Table of Contents

Advertisement

M800W/M80W Series Connection and Setup Manual
20 Setting the Hardware
When connecting to the operation panel I/O unit
Operation panel I/O unit occupies 15 stations among station No. 1 to 64.
Therefore, RIO3 can occupy up to 49 stations, as shown below.
Operation panel I/O unit type
FCU8-DX830/DX834/DX837
The connector RIO3EXT can occupy up to 51 stations, as shown below.
Operation panel I/O unit type
FCU8-DX730 (*)
(*)
FCU8-DX730 occupies 11 stations, but 13 stations are occupied in total since the graphic control
unit occupies 2 stations.
Setting example 1
Operation panel
I/O unit
(Note) The maximum connectable number of remote I/O units is 32.
IB-1501268-K
Max. number of stations
(RIO3 connection)
49 stations
Max. number of stations
(RIO3EXT connection)
51 stations
Remote I/O unit
FCU8-DX23□, FCU8-DX654, FCU8-DX654-1
Group1
4
E
0
2
4
0
2
4
0
2
4
Max. number of I/O points
(RIO3 connection)
Input:1568 points, Output:1568 points
Max. number of I/O points
(RIO3EXT connection)
Input:1632 points, Output:1632 points
1:OFF
2:OFF
6
8
A
C
6
8
A
C
6
8
A
C
430
Group2
1:OFF
2:ON
E
Group3
1:ON
2:OFF
E
Group4
1:ON
2:ON
E

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80w seriesM850wM830wM80w

Table of Contents