Mitsubishi Electric M800W Series Connection And Set Up Manual page 465

Hide thumbs Also See for M800W Series:
Table of Contents

Advertisement

M800W/M80W Series Connection and Setup Manual
20 Setting the Hardware
When connecting to the operation panel I/O unit
[Windows-based display]
Control unit
RIO3
Operation panel I/O unit
FCU8-DX830/DX834/DX837
[Non-Windows-based display]
When connecting a remote I/O unit to the 3rd RIO channel, insert it between the control unit and operation panel I/
O unit.
Control unit
RIO3
J210
Operation panel I/O unit
FCU8-DX730
(*)
FCU8-DX730 occupies 11 stations, but 13 stations are occupied in total since the graphic control unit
occupies 2 stations.
(Note 1) Refer to "20.6.4 PLC Device Assignment of Digital Signal (DI/DO)" for device No. assignment.
(Note 2) The maximum connectable number of remote I/O units is 32.
IB-1501268-K
Operation panel I/O unit
RIO3EXT
J210
RIO3
RIO occupied stations
1 to 4, 7 to 14, 20 to 22
Remote I/O unit
Max.51 stations (*)
Max. input: 1632 points
Max. output: 1632 points
RIO occupied stations
1 to 2, 7 to 12, 20 to 22
J210
Remote I/O 3ch
J210
Remote I/O 3ch
Graphic control unit
occupied stations
13,14
426
Remote I/O unit
Max.49 stations
Max. input: 1568 points
Max. output: 1568 points
Extensible stations
5, 6, 15 to 19, 23 to 64
Operation panel I/O unit
RIO3EXT
Extensible stations
3 to 6, 15 to 19, 23 to 64

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80w seriesM850wM830wM80w

Table of Contents