Mitsubishi Electric M800W Series Connection And Set Up Manual page 296

Hide thumbs Also See for M800W Series:
Table of Contents

Advertisement

M800W/M80W Series Connection and Setup Manual
7 Connection of Control Unit
(3) When using the additional axis drive unit by supplying power (L+, L-) from MDS-EM/EMH unit
The power (L+, L-) can be supplied to the additional axis drive unit by using the power supply part which is built into
MDS-EM/EMH.
Connected
to the NC
Optical
communication
cable
The optical communication cables from the NC to the
final drive unit must be within 30m.
CAUTION
1. There is a limit to the combination of the drive unit.
Refer to "7.3 Selection of the Additional Axis Drive Unit" in "MDS-EM/EMH Series Specifications Manual".
2. When using the additional axis drive unit by supplying power (L+, L-) from MDS-EM/EMH unit, install the optical
communication cables in a manner that makes MDS-EM/EMH unit the final axis. Failure to observe this could
lead to damage unit.
3. When installing the additional axis unit, install the spindle drive unit with maximum capacity adjacent to the
MDS-EM/EMH-SPV3, and connections for other drive units should be such that the total TE2 wiring length is
800mm or less.
MDS-E-V1
MDS-E-SP2
5th axis
6th/7th axis
When using MDS-EM drive unit together with MDS-E
257
MDS-EM-SPV3
MDS-E-SP
Spindle:1st axis
8th axis
Servo:2nd/3rd/4th axis
TE2
IB-1501268-K

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80w seriesM850wM830wM80w

Table of Contents