Engine Assembly Removal - Suzuki GSX1300BK B-King Service Manual

Hide thumbs Also See for GSX1300BK B-King:
Table of Contents

Advertisement

1D-19 Engine Mechanical:
NOTE
The learned value of the ISC valve is set at
RESET position.
6) Close the SDS tool.
7) Turn the ignition switch OFF position.
NOTE
The ISC valve opening initialization is
automatically started after the ignition switch
is turned OFF.

Engine Assembly Removal

Before taking the engine out of the frame, wash the
engine using a steam cleaner. Engine removal is
sequentially explained in the following steps:
1) Drain engine oil. Refer to "Engine Oil and Filter
Replacement in Section 0B (Page 0B-10)".
2) Drain engine coolant. Refer to "Engine Oil and Filter
Replacement in Section 0B (Page 0B-10)".
3) Lift and support the fuel tank. Refer to "Fuel Tank
Removal and Installation in Section 1G (Page 1G-
10)".
4) Remove the air cleaner box. Refer to "Air Cleaner
Box Removal and Installation (Page 1D-6)".
5) Remove the throttle body assembly. Refer to
"Throttle Body Removal and Installation (Page 1D-
I823H1140531-03
10)".
6) Disconnect the battery (–) lead wire.
7) Remove the frame body covers. Refer to "Exterior
Parts Removal and Installation in Section 9D
(Page 9D-14)".
8) Remove the horn (1) with its bracket.
B823H11406014
I823H1140528-01
1
I823H1140532-01

Advertisement

Table of Contents
loading

Table of Contents