1. CMP sensor
2. Oil pressure switch
3. Engine ground lead wire
4. CKP sensor
"A": When tightening the starter motor mounting
bolts, tighten rear one first.
: 10 N m (1.0 kgf-m, 4.7 lb-ft)
Service Data
Electrical
Item
Headlight
Signal
Ignition
Fuse size
Fuel
Fan (LH)
Fan (RH)
Main
Tightening Torque Specifications
NOTE
The specified tightening torque is also described in the following.
"Wiring Harness Routing Diagram (Page 9A-5)"
Reference:
For the tightening torque of fastener not specified in this section, refer to "Tightening Torque List in Section 0C
(Page 0C-9)".
Recommended Service Material
NOTE
Required service material is also described in the following.
"Wiring Harness Routing Diagram (Page 9A-5)"
: 14 N m (1.4 kgf-m, 10.0 lb-ft)
: 5 N m (0.5 kgf-m, 3.5 lb-ft)
: 6 N m (0.6 kgf-m, 4.3 lb-ft)
: 6.5 N m (0.65 kgf-m, 4.7 lb-ft)
: 11 N m (1.1 kgf-m, 8.0 lb-ft)
: 120 N m (12 kgf-m, 87 lb-ft)
Specifications
HI
LO
Special Tools and Equipment
"a": Approx. 45
"b": Within 20
"c": Within 10
: Apply bond to the thread part.
Specification
10 A
10 A
10 A
10 A
10 A
15 A
30 A
Wiring Systems:
9A-10
B823H19107001
Note
B823H19107002
B823H19108001