1B-10 Emission Control Devices:
Installation
Install the HO2 sensor in the reverse order of removal.
Pay attention to the following points:
CAUTION
!
Do not apply oil or other materials to the
sensor air hole.
• Tighten the HO2 sensor (1) to the specified torque.
Tightening torque
HO2 sensor (a): 25 N·m (2.5 kgf-m, 18.0 lb-ft)
• Route the HO2 sensor lead wire properly. Refer to
"Wiring Harness Routing Diagram in Section 9A
(Page 9A-5)".
Heated Oxygen Sensor (HO2S) Inspection
Refer to "DTC "C44" (P0130/P0135): HO2 Sensor
(HO2S) Circuit Malfunction in Section 1A (Page 1A-
104)".
PAIR Reed Valve Removal and Installation
Removal
1) Lift and support the fuel tank. Refer to "Fuel Tank
Removal and Installation in Section 1G (Page 1G-
10)".
2) Remove the air cleaner box. Refer to "Air Cleaner
Box Removal and Installation in Section 1D
(Page 1D-6)".
3) Disconnect the PAIR hoses (1) and remove the PAIR
reed valve covers (2).
2
1
(a)
I823H1120007-03
B823H11206002
B823H11206003
1
2
I823H1120008-07
4) Remove the PAIR reed valves (3).
3
Installation
Install the PAIR reed valve in the reverse order of
removal. Pay attention to the following points:
• Apply thread lock to the bolts and tighten them to the
specified torque.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Tightening torque
PAIR reed valve cover bolt (a): 11 N·m (1.1 kgf-m,
8.0 lb-ft)
(a)
3
I823H1120009-02
(a)
I823H1120010-01