Suzuki GSX1300BK B-King Service Manual page 584

Hide thumbs Also See for GSX1300BK B-King:
Table of Contents

Advertisement

Clutch Hose Routing Diagram (For E-33)
1
2
1. Stopper
: After the clutch hose union has contacted the stopper, tighten the union bolt.
2. Hose guide
: Install the grommet on the clutch hose to the hose guide (2) properly.
3. Protective rubber
: Pass the clutch hose under the steering damper bracket.
4. EVAP canister bracket
: 23 N m (2.3 kgf-m, 16.5 lb-ft)
(a)
" a "
3
" a "
2
(b)
" b "
2
4
" c "
(b)
(a)
: 6 N m (0.6 kgf-m, 4.5 lb-ft)
"a": 14
"b": 42
"c": 21
Clutch:
5C-3
B823H15302002
1
I823H1530060-01

Advertisement

Table of Contents
loading

Table of Contents