Suzuki GSX1300BK B-King Service Manual page 258

Hide thumbs Also See for GSX1300BK B-King:
Table of Contents

Advertisement

24) Disconnect the starter motor lead wire (17).
25) Disconnect the engine ground lead wire (18).
26) Disconnect the ECT sensor lead wire coupler (19)
and GP switch lead wire coupler (20).
27) Remove the engine sprocket outer cover. Refer to
"Engine Sprocket Removal and Installation in
Section 3A (Page 3A-2)".
17
I823H1140547-01
18
I823H1140548-01
19
20
I823H1140549-01
28) Disconnect the CKP sensor lead wire coupler (21),
generator lead wire coupler (22) and side-stand lead
wire coupler (23).
21
22
29) Disconnect the CMP sensor lead wire coupler (24),
ignition coil/plug cap lead wire couplers (25) and
PAIR hoses (26) from the cylinder head cover.
CAUTION
!
Do not remove the ignition coil/plug cap
before disconnecting its coupler.
24
30) Remove the ignition coil/plug caps (27).
CAUTION
!
• Do not pry up the ignition coil/plug cap
with a screwdriver or a bar to avoid its
damage.
• Be careful not to drop the ignition coil/plug
cap to prevent its short or open circuit.
Engine Mechanical:
1D-22
23
I823H1140550-01
26
25
I823H1140551-02
27
I823H1140552-01

Advertisement

Table of Contents
loading

Table of Contents