Data Backup; Backup Progress And Completion Indicators - Toshiba Strata CTX Programming Manual

Digital business telephone systems
Hide thumbs Also See for Strata CTX:
Table of Contents

Advertisement

Maintenance
This chapter provides Strata CTX maintenance procedures that can be activated from the programming
telephone. For SmartMedia, refer to

Data Backup

1. Format the SmartMedia using
2. Insert the formatted SmartMedia into Strata CTX.
3. Backup data using
following:
)%
)%
~
)%
intermittent green.
)%
4. Press
and choose Backup by pressing
CAUTION!
Never use Restore (2). It is not valid for current versions of CTX software and could
result in corrupt databases and system mis-operation.
+ROG
5. Press
. Backup for programmed data starts. The LED indicator
during back up. After back up is complete,
Do not press
CAUTION!
+ROG
6. Press
twice to exit programming.

Backup Progress and Completion Indicators

You can monitor Backup progress by pressing the
on
page 13-103
for more details.
• If the value displayed in the LCD is increasing each time
successfully.
• When the value displayed in the LCD for
complete.
)%
• When the
)%
• Press
to verify Backup is completed. If the LCD displays
Strata CTX Programming - Part 3:Telephone Button Programming 04/03
"Format/Unmount SmartMedia"
"Format/Unmount SmartMedia"
"Data Backup"
on
page 13-103
solid red light.
+ROG
while Backup is being performed.
LED returns to an intermittent green, Backup is complete.
on
on
page 13-101
(Program 910). LED indicators should show the

on the telephone button pad.
)%
will flash inconsistently slower.
)%
)%
or
buttons as follows. See
)%
is pressed, the Backup is proceeding
)%
)%
and
are the same, the Backup process is
*1:
ALL_OK
page
13-101.
(Program 908).
)%
consistently blinks green
"Data Backup"
the Backup was successful.
14
14-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strata ctx100Strata ctx670

Table of Contents