Installing Memory Modules; Required Tools; Preliminary Steps - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Server
Table of Contents

Advertisement

Main memory
– In order to satisfy cooling requirements, populate memory channels on
alternating sides of the processor:
Order
1
2
3
4
10.2

Installing memory modules

Upgrade and Repair Units (URU)
Average task duration: 5 minutes

10.2.1 Required tools

Preliminary and concluding steps: tool-less
Installing memory modules: tool-less

10.2.2 Preliminary steps

Before installing a memory module, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê Shut down the defective server as described in section
server" on page
Ê Remove the AC power cords from the PSU cable brackets and disconnect
them from the system as described in section
from the mains" on page
546
CPU 1
Channel A
Channel C
Channel B
Channel D
139.
69.
70.
Upgrade and Maintenance Manual
CPU 2
Channel E
Channel G
Channel F
Channel H
"Disabling BitLocker
"Disabling
140.
"Shutting down the
"Disconnecting the server
TX300 S7 / RX350 S7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s7

Table of Contents