Replacing An Fbu - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Server
Table of Contents

Advertisement

Note on BBU charging and calibration
The BBU may be deeply discharged due to extended storage time and wrongly
show as bad or defective in the ServerView RAID Manager.
In this case, the BBU will automatically enter a trickle charge cycle for recovery.
This initial charge may take up to 8 hours before the BBU will initiate a
recalibration cycle.
Ê Enter the ServerView RAID Manager and check the current BBU status.
I
For further information, please refer to the "ServerView Suite RAID
Management" user guide, available online at
http://manuals.ts.fujitsu.com (http://jp.fujitsu.com/platform/server/
primergy/manual/
Suite DVD 2 supplied with your PRIMERGY server.
Ê If the BBU is shown as bad or defective, do not power off the server for at
least 8 hours to allow the charge and calibration cycles to finish.
Ê If the BBU status does not change after 8 hours, please try to initiate the
recalibration process manually using the ServerView RAID Manager.
I
If this procedure still does not fix the BBU status, please contact your
local Fujitsu customer service partner.
9.6.7

Replacing an FBU

Upgrade and Repair Units (URU)
Average task duration: 10 minutes
V
CAUTION!
Do not throw battery backup units into the trash can. Batteries must be
disposed of in accordance with local regulations concerning special
waste.
For further safety information, please refer to section
protection" on page
TX300 S7 / RX350 S7
for the Japanese market) or from the ServerView
58.
Upgrade and Maintenance Manual
Expansion cards and backup units
"Environmental
523

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s7

Table of Contents