Viewing The Job History - HP StorageWorks 6000 - Virtual Library System User Manual

Hp storageworks 6000-series virtual library system user guide (ah809-96038, march 2010)
Hide thumbs Also See for StorageWorks 6000 - Virtual Library System:
Table of Contents

Advertisement

To update an existing view, select it from the Update existing view list, adjust the selected locations,
rename the view (if desired) in the name field, and select Update View. Select Delete View if you want
to remove that view from your pre-defined options.
At any time, you can change any of these default settings.

Viewing the Job History

The Job History screen displays the history of the completed library jobs. It defaults to SAN jobs only,
and displays the number of days set as the default on the Configuration screen.
The job history table displays for each job:
Barcode
Start and end times
Size in MB
Data transfer time
Total processing time
Transfer rate
Source and target locations
The node the job is running on
Completion status
Compression (yes or no)
The performance graph maps the MB per second against the time it took the jobs to complete.
To change the jobs included in the job history report, select a View previously created on the
Configuration screen. If you haven't set up any views:
1.
Select a location category. See
2.
Select the specific locations of interest from the Available Locations box. You can select multiple
devices by using Ctrl+click.
3.
Using the >> button, or by double-clicking, move the locations of interest into the Selected Locations
box. These are the locations that will display in the report. You can use << button to remove
locations from the Selected Locations box.
4.
Change the number of days the report includes.
NOTE:
Changing the number of days here does not affect the default number set on the
Configuration screen.
5.
Select a new location type; the default is Both. You can change the report to include only the
jobs where the selected devices acted as:
• Target — the selected device receives the data.
• Source — the selected device sends the data.
6.
Select Update. The job history table and performance graph update to include jobs based on
the new criteria.
114
Automigration/Replication
Figure
54.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks 6000 series

Table of Contents