Checking The Leds - Avaya PARTNER ACS Installation And Use Manual

Advanced communications system
Hide thumbs Also See for PARTNER ACS:
Table of Contents

Advertisement

If your system has a 1600 DSL module, initialization of the line and extension ports may
take up to 40 seconds. The initialization of the 1600 DSL module itself may take from 2 to
7 minutes.

Checking the LEDs

After you power up your system, check the green
lights on the fronts of the modules (see
If a single light is out, power down the control unit,
I
reseat the module, and then power up the carrier.
If multiple lights are out, power down the control
I
unit, reseat either both modules (2-slot carrier) or
the leftmost module that has a light out (5-slot
carrier), and then power up the carrier.
If the lights are still out, see the Customer Support
Document on the accompanying compact disc for
information about whom you should contact.
Figure
2-17):
Figure 2-17. Module LEDs
Installation
Lights
20
23
26
1
21
24
27
2
22
25
28
3
Installing the Control Unit
2-15

Advertisement

Table of Contents
loading

Table of Contents