Chapter 3: Preparing the MCU Setup

Perform procedures in this section to prepare the site and device for installation.
Related links

Checking Site Suitability

Unpacking the Device

Inspecting for Damage
Checking Site Suitability
Prior to setting up your device, you need to verify your site suitability for:
• System power requirements
• System environmental requirements
• The device physical dimensions.
For more information, see
these requirements. Ensure the site conforms to the listed requirements.
Related links
Preparing the MCU Setup
Unpacking the Device
About this task
We strongly recommend that you follow safety guidelines described in this section during unpacking.
Procedure
1. Inspect the shipping box to verify that it is not seriously damaged during shipping.
2. Place the shipping box on a horizontal surface paying attention to the This Side Up symbol
on the shipping box
February 2016
on page 25
on page 25
on page 26
Minimum Requirements and Specifications
on page 25
(Figure 6: This Side Up symbol
®
Avaya Scopia
Elite 6000 Series MCU Installation Guide
Comments on this document? infodev@avaya.com
on page 12 to learn about
on page 26).
25

Advertisement

Table of Contents
loading

Table of Contents