Checking The Leds - Avaya PARTNER Advanced Communications System Quick Reference Manual

Hide thumbs Also See for PARTNER Advanced Communications System:
Table of Contents

Advertisement

2 Installing Your System

Checking the LEDs

After you power up your system, check the green lights on the fronts of the
modules:
• If a single light is out, power down the control unit, reseat the module, and
then power up the carrier.
• If multiple lights are out, power down the carrier, reseat either both modules
(2-slot carrier) or the leftmost module that has a light out (5-slot carrier),
and then power up the carrier.
If the lights are still out, see the "Customer Support Document" on the
accompanying compact disc for information about whom you should contact.
22
Installing the Control Unit
• If your system has a 1600 DSL module, initialization of the
line and extension ports may take up to 40 seconds. The
initialization of the 1600 DSL module itself may take from 2 to
7 minutes
• If your system has a T1 module, initialization may take up to
one minute.
Quick Reference Guide

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PARTNER Advanced Communications System and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Partner advanced communications system 7.0

Table of Contents