Web Interface: Creating Two LAGs
To use the Web interface to configure the managed switch, proceed as follows:
1.
Create LAG lag_10.
a.
From the main menu, select Switching > LAG >LAG Configuration. A screen similar to the
following displays.
Figure 5-2
b. In the Lag Name field, enter lag_10.
c.
Click the Add.
2.
Create LAG lag_20.
a.
From the main menu, select Switching > LAG >LAG Configuration. A screen similar to the
following displays.
Figure 5-3
b. in the Lag Name field, enter lag_20.
c.
Click Add.
Add the Ports to the LAGs
The example is shown as CLI commands and as a Web interface procedure.
Link Aggregation
NETGEAR 7000 Series Managed Switch Administration Guide Version 7.3
v1.0, November 2008
5-3