Install the Battery
3.
Return the server to operation.
Install the server top cover.
a.
See
b.
Return the server to the normal rack position.
See
Reconnect the power cords to the server power supplies, and power on the
c.
server.
See
Server" on page
Verify that the System OK LED indicator is lit.
d.
Note -
the Network Time Protocol (NTP), the Oracle ILOM SP clock will be reset as soon as the
server is powered on and connected to the network; otherwise, proceed to the next step.
If the service processor is not configured to use NTP, you must do one of the
4.
following:
Reset the Oracle ILOM SP clock using the Oracle ILOM CLI or the web interface.
■
Refer to the Oracle Integrated Lights Out Manager (ILOM) 5.0 Documentation Library at
https://www.oracle.com/goto/ilom/docs.
Use the BIOS Setup Utility to reprogram the host clock.
■
Refer to the Oracle X8 Series Servers Administration Guide at
goto/x86admindiag/docs.
Related Information
"Remove the Battery" on page 141
■
144
Oracle Server X8-2L Service Manual • January 2021
"Install the Server Top Cover" on page
"Return the Server to the Normal Rack Position" on page
"Reconnect Power and Data Cables" on page 222
222.
If the service processor is configured to synchronize with a network time server using
218.
220.
and
"Power On the
https://www.oracle.com/
Need help?
Do you have a question about the X8-2L and is the answer not in the manual?
Questions and answers