6.
Return the server to operation.
Install the top cover.
a.
See
"Install the Server Top Cover" on page
b.
Return the server to the normal rack position.
See
"Return the Server to the Normal Rack Position" on page
Connect any required data cables to the PCIe card.
c.
Route data cables through the cable management arm.
d.
Reconnect the power cords to the power supplies and power on the server.
See
"Reconnect Power and Data Cables" on page 222
Server" on page
e.
Verify that the System OK LED is lit.
Use Oracle ILOM to clear any server PCIe card faults.
7.
If a PCIe card fault message in Oracle ILOM is not cleared under Open Problems, you must
manually clear the fault using Oracle ILOM. For instructions for manually clearing a PCIe
card fault, see the procedure "Clear Faults for Undetected Replaced or Repaired Hardware
Components" in the Oracle ILOM User's Guide for System Monitoring and Diagnostics in the
Oracle Integrated Lights Out Manager (ILOM) 5.0 Documentation Library at
oracle.com/goto/ilom/docs.
8.
To determine whether additional steps are required to complete the installation
of the PCIe card, refer to the server product notes for the type of PCIe card you
installed.
Related Information
"PCIe Slot Locations" on page 134
■
"Remove a PCIe Card" on page 135
■
222.
218.
220.
and
"Power On the
Servicing PCIe Cards (CRU)
Install a PCIe Card
https://www.
139
Need help?
Do you have a question about the X8-2L and is the answer not in the manual?
Questions and answers