To pull the green release tab, place your finger in the center of the tab, not on the end,
Note -
and apply pressure as you pull the tab toward the front of the server.
b.
Continue pushing the server into the rack until the slide-rail locks (on the
front of the server) engage the slide-rail assemblies.
You will hear an audible click when the server is in the normal rack position.
2.
If the CMA is not installed, that is, you removed it because you removed the
server completely out of the rack, install the CMA.
For installation instructions for the CMA, refer to
(Optional)" in Oracle Servers X8-2 and X8-2L Installation
3.
If the cables are disconnected from the back of the server, that is, you
disconnected the cables because you extended the server out of the rack,
reconnect the cables.
For instructions to reconnect cables to the back of the server, see
■
Data Cables" on page
"Install the Cable Management Arm
222.
Return the Server to the Normal Rack Position
Guide.
"Reconnect Power and
Returning the Server to Operation
221
Need help?
Do you have a question about the X8-2L and is the answer not in the manual?
Questions and answers