"Powering Down the Server" on page 55
■
"Disconnect Cables From the Server" on page 61
■
"Extend the Server to the Maintenance Position" on page 62
■
"Remove the Server From the Rack" on page 64
■
"Take Antistatic Measures" on page 65
■
"Remove the Server Top Cover" on page 65
■
Related Information
"Returning the Server to Operation" on page 217
■
Powering Down the Server
Determine how you want to power down the server by reviewing the options in the following
table.
Some server components, such as storage drives, power supplies, fan modules, and M.2
Note -
flash SSDs are hot-pluggable. Components that are hot-pluggable do not require the server to be
powered down when performing service procedures.
Description
Power down the server gracefully to prevent data from
being corrupted. Performing a graceful shutdown ensures
that the system is ready for restart.
If the server is not responding, or you must shut down
the server quickly, perform an immediate shutdown.
Related Information
"Power On the Server" on page 222
■
Preparing the Server for Component Replacement
Link
■
"Power Down the Server Gracefully Using the
Oracle ILOM CLI" on page 56
■
"Power Down the Server Gracefully Using the
Oracle ILOM Web Interface" on page 57
■
"Power Down the Server Gracefully Using the On/
Standby Button" on page 58
■
"Power Down the Server for Immediate Shutdown
Using the Oracle ILOM CLI" on page 59
■
"Power Down the Server for Immediate
Shutdown Using the Oracle ILOM Web
Interface" on page 60
■
"Power Down the Server for Immediate Shutdown
Using the On/Standby Button" on page 60
Preparing for Service
55