Technogym Group Cycle D92 Technical Service Manual page 173

Table of Contents

Advertisement

New Group Cycle (D92):
Technical Service Guide - Rev. 5.1
8
Figure 180
Figure 181
10
Figure 182
Document uncontrolled when printed
9
10
8.
Remove the cover (8).
9.
Remove the nut (9) with a 13 mm tubular
box wrench.
Every time you remove the self-locking nut
(9) from the machine: it's requested to re-
place the self-locking nut with the new one.
The self-locking nut must be tightened with
a torque wrench set to 3.9 Nm (2,88 lbf- ft).
10.
Remove the quick-release lever (10).
To reassemble the handlebar's horizontal slider and
fit back on the bike, follow the aforementioned in-
structions in the reverse order.
Page 173

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents