UNLOADING AND ASSEMBLING THE MOWER CONDITIONER
21. Feed shortest hose (A) through opening (B) in carrier
frame as shown with male end (C) at hitch pivot.
22. Connect hoses (A) and (D) at hitch pivot.
23. Retrieve other end of hose at opening (A) above lift left
cylinder. Use a draw tape (B) to route hose through
carrier frame opening (A).
24. Open both lift cylinder lock-out valves.
25. Raise header with jack (A).
26. Close both lift cylinder lock-out valves.
27. Remove pallet (B) from under header.
169821
Figure 5.93: Lift Hose
Figure 5.94: Hose Routing
Figure 5.95: Jacking Header
60
Revision D