UNLOADING AND ASSEMBLING THE MOWER CONDITIONER
11. Remove transport wheels (C) from pallet.
12. Remove the five M20 hex head bolts (A) and nuts in
transport assembly pin (B). Do not remove pin.
13. Move valve and hoses (D) off the pin.
14. Pick up pallet with transport assembly (A) using a
forklift and approach the rear of the mower conditioner.
15. Position assembly up to frame and align pin (B) in
transport assembly with hole (C) in carrier.
16. Maneuver assembly until pin can be inserted into hole.
Use a soft hammer or equivalent to fully insert pin.
17. Align bolt holes and install three M20 x 65 bolts (A),
hardened washers (B), and nuts at locations shown.
18. Position control valve assembly (C) on pin and install
two M20 x 65 bolts (D), hardened washers, and nuts.
19. Torque bolts to 340 lbf·ft (461 N·m).
169821
Figure 5.65: Transport Packing
Figure 5.66: Endwise Transport
Figure 5.67: Endwise Transport
50
Revision D