Swivel And Up-Down Handle Installation Procedure - GE VIVID S60N Basic Service Manual

Hide thumbs Also See for VIVID S60N:
Table of Contents

Advertisement

P R E L I M I N A R Y
D
FR091521, R
IRECTION
7.) Disconnect the up-down/swivel cable from the handle to be replaced and slide the handle sideways
to remove it from the supporting shaft -
8-6-7-5

Swivel and Up-Down Handle Installation Procedure

1.) Install the appropriate handle on the support shaft.
2.) Return spring/s and securing clip/s to secure the handle/s.
3.) Return the protective metal plate and secure it with the retaining screw (previously removed).
4) Install the Probe Shelf as described in the
5.) Install the Operator Panel as described in the
Procedure on page 8 -
6) Lower the console to the maximum down position.
7.) Turn ON power to the system.
1
EVISION
Figure 8-192 Release Cable and Slide Handle Sideways
47.
Chapter 8 - Replacement Procedures
V
S60N/V
IVID
IVID
Figure
8-192.
Probe Shelf Installation Procedure on page 8 -
Operator Panel Keyboard Assembly Installation
S70N
B
S
M
ASIC
ERVICE
ANUAL
166.
8-157

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid s70n

Table of Contents