Fan (Ac Distribution Box) Installation Procedure - GE VIVID S60N Basic Service Manual

Hide thumbs Also See for VIVID S60N:
Table of Contents

Advertisement

P R E L I M I N A R Y
D
FR091521, R
IRECTION
5.) Remove the other 3 remaining securing rubber holders.
8-5-22-5

Fan (AC Distribution Box) Installation Procedure

NOTE:
When assembling a new AC Box Fan on the fan base, make use of the replacement rubber holders
(kit supplied with the new Fan).
1.) From the underside of the fan, thread the rubber holder through the aperture on the fan and pass
the rubber holder through the aperture on the fan base -
2.) Pull the rubber holder through from above the fan base until it fastens the fan securely to the base.
Repeat this task using the 3 remaining rubber holders provided.
3.) Connect the fan cable to the connector on the AC Distribution Box -
4.) Place the Fan in position then fasten with the 4 securing screws (previously removed) -
5.) Install the AC Distribution Box:
6.) Turn ON power to the system.
8-144
Section 8-5 - Electronic Cage Components - Replacement Procedures
1
EVISION
Figure 8-175 Flexible Rubber Holders - Cut and Remove
AC Distribution Box Removal Procedure on page 8 - 139
V
S60N/V
S70N
IVID
IVID
Figure
8-175.
Figure
B
S
M
ASIC
ERVICE
ANUAL
8-174.
Figure
8-173.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid s70n

Table of Contents