P R E L I M I N A R Y
D
FR091521, R
IRECTION
8-5-20
BIF Connection Map Label Replacement Procedure
Note:
The BIF Connection Map label, is orderable as a separate part.
8-5-20-1
Tools
No special requirements.
FRU Part #
Refer to
8-5-20-2
Time Required
5 min
8-5-20-3
Preparation
Shut down the Vivid™ S60/Vivid™ S70 ultrasound unit, as described in
8-5-20-4
BIF Connection Map Label Removal Procedure
The label is located on the sub-woofer -see
Figure 8-166 Sub-Woofer Showing Location of BIF Connection Map Label
1.) Using a blunt non-metallic instrument, carefully peel off the existing label.
2.) Clean and prepare the sub-woofer's surface for adhering the replacement label.
8-5-20-5
BIF Connection Map Label Installation Procedure
1.) Remove the self-adhesive replacement label from its packing
2.) Carefully adhere the label to the sub-woofer's surface making sure that it is position straight and
parallel to the inlaid impression on the sub-woofer.
8-138
Section 8-5 - Electronic Cage Components - Replacement Procedures
1
EVISION
Table 9-14
on page 9-13
.
Figure
8-166.
V
S60N/V
S70N
IVID
IVID
Power Shut Down on page 4 -
B
S
M
ASIC
ERVICE
ANUAL
7.