P R E L I M I N A R Y
D
FR091521, R
IRECTION
8-4-1-5-1
Installing the Cables
Start the cable installation procedure as described in the following steps.
1.) Thread the blue main display cable downwards through the top articulated arm aperture and lead
the cable through to the lower articulated arm aperture downwards towards the OPIO platform -
refer to
2.) Continue and lead the cable's BIF connector through the OPIO aperture towards the Internal BIF
Panel as shown in -
1
EVISION
Figure 8-92 below
and
Figure 8-92 Feeding Cables through Top Aperture
Figure 8-93
Figure 8-93 Feeding Cables through OPIO Aperture
Chapter 8 - Replacement Procedures
V
IVID
Figure 8-93
below.
below.
S60N/V
S70N
B
IVID
ASIC
S
M
ERVICE
ANUAL
8-73