Ac Distribution Box Replacement Procedure; Tools; Time Required; Preparation - GE VIVID S60N Basic Service Manual

Hide thumbs Also See for VIVID S60N:
Table of Contents

Advertisement

P R E L I M I N A R Y
D
FR091521, R
IRECTION
8-5-21

AC Distribution Box Replacement Procedure

8-5-21-1

Tools

Flat and Phillips screwdriver.
FRU Part #
Table 9-13
Refer to
8-5-21-2

Time Required

45 mins
8-5-21-3

Preparation

Shut down the Vivid™ S60/Vivid™ S70 ultrasound unit, as described in
8-5-21-4

AC Distribution Box Removal Procedure

NOTE:
The AC Distribution Box is located at the rear of the system -
1.) Remove the AC Distribution Box cover, then the battery:
AC Distribution Box Cover Removal Procedure on page 8 - 29
Battery Removal Procedure on page 8 - 145
2.) Disconnect the Ground cable -
1
EVISION
.
on page 9-12
Figure 8-167 AC Distribution Box Located at Rear of System
Figure 8-168 Disconnecting the Ground Cable
Chapter 8 - Replacement Procedures
V
IVID
Figure
8-168.
S60N/V
S70N
B
IVID
ASIC
Power Shut Down on page 4 -
Figure
8-167.
AC Distribution Box
S
M
ERVICE
ANUAL
7.
8-139

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid s70n

Table of Contents