vmr2006-066-013

INSPECTION

Check parts for cracks, corrosion or any other de-
fault. Also check engine supports. Replace dam-
aged part as necessary.

INSTALLATION

Installation is the reverse procedure of removal.
However, pay attention to the following.
Align shift lever dot with flat surface on shift shaft.
vmr2006-066-015_a
1. Dot
2. Flat surface
Reconnect battery cables.
vmr2006-066
Subsection 01 (ENGINE REMOVAL AND INSTALLATION)
vmr2006-069-006_b
Step 1: Positive first
Step 2: Negative last
Refill cooling system. Refer to COOLING SYS-
TEM.
Refill engine with oil. Refer to LUBRICATION
SYSTEM.
Check throttle and choke cables adjustment. Re-
fer to FUEL SYSTEM.