Starting Solenoid - BRP BOMBARDIER DS250 2006 Shop Manual

Table of Contents

Advertisement

NOTE: On European models, ensure brake switch
is working properly. Refer to BRAKING SYSTEM.
If voltage is good, continue testing.
Remove front cover. Refer to BODY.
Disconnect start switch connector with the
YELLOW/RED and YELLOW/BLACK wires.
vmr2006-079-009_a
Use a multimeter and set it to .
Read resistance as follows.
vmr2006-080-012_a
START SWITCH
POSITION
WIRE
Switch
released
YELLOW/RED and
Switch
YELLOW/BLACK
depressed
and held
Replace switch if defective.
vmr2006-080
If switch tests good, check starting solenoid
winding. See below. If winding tests good,
check power supply to shift gear control module.
Refer to IGNITION SYSTEM.
Reconnect switch connector.

STARTING SOLENOID

Inspect connections and clean as necessary.
vmr2006-078-001_d
Static Test: Continuity
Disconnect connector from solenoid.
vmr2006-080-010_a
RESISTANCE
Infinite (0L.)
0.6
max.
Section 05 ELECTRICAL SYSTEM
Subsection 03 (STARTING SYSTEM)
145

Advertisement

Table of Contents
loading

Table of Contents