System Installation, Start Up and Shut Down
Installing the FTIR Analyzer into the Rack
Connect the FTIR
The following connections need to be made to the FTIR unit: Purge,
Power, Computer, Pressure, Cell heater and Sample lines
(Figure
2–3).
Unit
Figure 2–3. Purge and Power Connections
Thermo Fisher Scientific
Omni FTIR Multi Gas CEMS Instruction Manual