System Installation, Start Up and Shut Down
Installing the FTIR Analyzer into the Rack
2-4
Omni FTIR Multi Gas CEMS Instruction Manual
Figure 2–2. Analyzer Installation
Remove screws and front FTIR rack panel and set aside for reassembly
later. It may be helpful to remove unpopulated side panel (not shown).
Remove rubber feet inserts from bottom of the calibrated FTIR power
supply that is to be used with this assembly. Cut 2 lengths of 4.5" of
112596-00 Velcro with hook & loop engaged. Remove backing from loop
side only and attach to bottom of FTIR power supply, in 2 places, widely
spaced.
Remove screws and cover from FTIR shelf and set aside for reassembly
later. Pull FTIR shelf out all the way. Remove backing of Velcro and
position power supply up against the inside of the back lip and against the
right side bend of the shelf assembly
even pressure and push down to secure the Velcro. Run cable to shelf
assembly alongside the power supply. Reinstall FTIR shelf cover.
Use 2 people to install FTIR to shelf. Carefully place FTIR on top of shelf
while lining up shock mount feet holes to the 8 studs on the FTIR shelf.
Secure with 8 nuts.